1300 DURHAM

Rail - Richmond Line Alliance

  • Installing of HV Drainage Pit location.JPG
  • Installed HV Drainage Pit.JPG
  • Install of HV Drainage Pit.JPG
  • Crane lift from truck.JPG
  • Crane lift from truck to pit.JPG
  • Lowering of Custom HV Pit.JPG
  • Lowering Custom HV Pit onto base.JPG
  • Alligning pit onto drainage sump base.JPG
  • Client happy with the products.JPG
  • Placing Custom HV Pit and aligning onto sump.JPG
  • Placing of Custom HV Pit.JPG
  • Installed Custom HV Pit.JPG
  • Unloaded HV multipart lid.JPG
  • Lowering of HV Multipart lid.JPG
  • Installing of HV Multipart Lid.JPG
  • Allining HV Multipart lid.JPG
  • Placing of HV multipart Lid.JPG
  • Alligning placing of HV Multipart Lid.JPG
  • Final allingment of HV Multipart Lid.JPG